PACIÊNCIA COMPLEX

Two underground gold mines and a 2,000 tpd processing plant, with options to restart the permitted Santa Isabel mine.

Care & maintenance
A3 — Overview

PACIÊNCIA COMPLEX

The Paciência Complex was placed on care and maintenance in May 2012. The complex is located 80 kilometres by tarmac road southeast of Belo Horizonte and close to the Company’s two operating assets (Caeté plant and Pilar mine) in the prolific Iron Quadrangle of Minas Gerais.

Location
80 km southeast of Belo Horizonte, Minas Gerais
Mines
Santa Isabel, Marzagão (underground)
Processing capacity
~2,000 tpd
Permitted tenements
~9,000 hectares
Historic production
~154,000 oz Au (2008–2012)
Status
Care and maintenance since May 2012

Inside the asset

HOW IT WORKS

01

Mines & Plant

The complex includes two underground gold mines, Santa Isabel and Marzagão, and a processing plant with capacity to treat approximately 2,000 tpd, located within approximately 9,000 hectares of contiguous permitted mining tenements.

02

Production History

The plant was commissioned in April 2008 and the mine produced approximately 154,000 ounces of gold through May 2012, based on approximately 1,755,000 ore tonnes processed, averaging a gold grade of 3.06 g/t and a recovery of about 89%.

03

Santa Isabel Mine

At current gold prices, the Company is evaluating options to bring back online the Santa Isabel mine which is already fully permitted. Ore would initially be hauled to the Caeté plant which is approximately 35 kilometres away.